Gravity or screw take-up mechanism has reached its maximum travel. Belt or chain has stretched to the point where the take-up can no longer maintain proper tension.
When you re-splice a belt, always set the take-up to 40-50% travel, not fully retracted. If you set it at the minimum, the take-up has nowhere to go as the belt stretches and you'll be back cutting the belt again in 6 months. Leave room for the belt to stretch.
Parts matched to fault category: Conveyor Belt
Prices are estimates. Verify part numbers match your equipment before ordering.
Need a deeper diagnosis with photo analysis and AI-powered troubleshooting?
Run Full Diagnosis