Load transfer between the AS/RS infeed/outfeed conveyor and the crane platform failed. Load did not complete the handoff within the allowed time.
The handoff point between conveyor and crane is the highest-maintenance area in any AS/RS system. Put it on a weekly inspection schedule — check roller alignment, sensor cleanliness, and conveyor chain tension at the handoff zone. 40% of AS/RS downtime happens at this one point.
Parts matched to fault category: Photoelectric Sensor
Prices are estimates. Verify part numbers match your equipment before ordering.
Need a deeper diagnosis with photo analysis and AI-powered troubleshooting?
Run Full Diagnosis